Oil, gas and petrochemical trends

Establishment of Khatam al-Anbia’s construction site (PBUH)

According to Article 147 of the Constitution, the Islamic Revolutionary Guard Corps, in accordance with Article 147 of the Constitution, has entered into an agreement with the contractor to execute the orders of the Supreme Leader on the participation of the Revolutionary Guards in the reconstruction and construction of the country and the country’s socio-economic development plans during peacetime.
Hence, the construction site of Khatam-ol-Anbia (PBUH) was established on the basis of the aforementioned decree since 1989 , and in line with the mission of defending the achievements of the Islamic Revolution and the comprehensive development of the country into the realm of construction, with the implementation of large national projects in various fields, including the dam , Roads, runways, buildings, irrigation and drainage, long tunnels, water pipelines, oil and gas, jetties and offshore structures, reservoirs for storing oil, gas and oil products, huge oil and gas installations, and drilling in the sea and land. Helping the Government of the Islamic Republic and serving the people in this field has achieved its valuable achievements.

The objectives of the construction site of Khatam Al Anbia (PBUH)

– Optimal use of specialized resources, facilities and talents
– Establishing a systematic and legal procedure for the participation of the IRGC in the implementation of economic, social and cultural development programs of the government
– Earning experience and technical knowledge to enhance the country’s specialized, combat and defense capabilities
– Creating a suitable platform for the participation of committed and basij forces in the development of the country
– Disqualification in disadvantaged areas alongside ongoing projects
– Construction of the country and enhancement of the ability of consulting engineers, contractors and domestic manufacturers of goods
– To create a balance in the price of tenders for national and big projects of the country

Entry into oil, gas and petrochemicals
Considering that the country’s most revenue was from the production and sale of crude oil and its main contractors were foreign companies and the presence of Iranian companies in the management, engineering and implementation of projects in the field of oil and gas was very low, especially in the upstream areas The vacancy of the presence of specialized companies in Iran has been quite tangible. Therefore, Khatam-ol-Anbia (PBUH) construction site has been determined since 1999 to reduce foreign threats to South Pars projects by imposing sanctions on oil, gas and petrochemicals. By implementing projects of the peripheral facilities, including the pond for the development of South Pars phases, Gas transmission lines began. And in 2001, with the participation in the tender for the construction of a petrochemical port in Assalouyeh, the construction of one million barrels of oil reservoirs and the reconstruction of the control system for oil reservoirs in the Kharg Island was won.
The construction site of Khatam-ol-Anbia (PBUH) became more prominent in this area by winning the tender for the development of Phases 15 and 16 of the South Pars. Now the campus is known as the largest contractor with the leadership, management, design and implementation of the indigenous industries of the country’s oil and gas industry.

Development of fields

Refinery industries

Reservoirs and petroleum products

Oil and gas transmission lines

Oil and gas transmission lines

Capabilities

– Crude oil pipelines, petroleum products
– Gas transmission lines in the sea and inland
– Design and implementation of gas pressure boost stations
– Design and implementation of pump houses

The most important projects are:

Construction of ground pipelines in mainland Kish
Construction of 92 km 56- inch pipeline

6th Gas Pipeline (Ahwaz – Dehgolan)
Construction of 597 km of pipeline “56
Branch of Abdanan 85 Km to Diameter “12
Dehloran branching 121 Km to Qatar “20
The oil branch of 98 Kilometro to Qatar “48
The branch of Dehgolan and the branch of 32 kilometers to Qatar “30
And 4 stations of pressure control and the corresponding telecommunications system

Abadan Oil Transmission Line – Arak – Ray
The construction of a pipeline covering 650 km and 20 , 24 and 26 inches, and 7 pumping stations, a main station at the main terminal in Rai

The most important projects are finished

Continue the seventh gas pipeline

The seventh gas pipeline, 56 inches (Asalouyeh – Sistan & Baluchestan)
902 km 56- inch tube line with two 1400 PSI pressure boost stations

Construction of a 56- inch (10-gauge) Transmission Gas Pipeline (Petahu-Pul-e-Kell)
175 kilometers 56- inch pipeline 30 kilometers 40- inch pipeline

Construction of 36 second Khoram Abad Secondary Gas Pipeline and Khorram Abad Pressure Reduction Station No. 2 (Khorram Abad-Malayer)
Around 168 kilometers of 36- inch pipelines along with a CGS station

Construction of 48- inch transmission line of Hamedan-Bijar using PC
About 142 kilometers of pipelines are 48 inches and 10 kilometers by 40 inches

Refinery Industries

Capabilities:

Oil refineries and gas condensate
Gas refineries
Petrochemical complexes
NGL complexes
Utility and offshore facilities
Intake and gassing facilities

The most important projects are:

Construction and Sewil Construction Project of Iran LNG Project Gasification Project
Implementation of Construction and Sewil gas sweetening project

Run LNG utility & offsite project
Operations for the construction of wastewater treatment plant, surface canals, roads, flair, industrial and non-industrial buildings, site lighting and … from utility and offshore units

Construction of Gas and LNG Plant 3200 NGL West of Karun River
The construction of an NGL plant in an area of 180 hectares in the west of the Karoon River to process 500 million ft. Cubic feet of sour gas daily from Torkhvin, Yadavaran, Azadgan, Jeffrey and Karkhah fields to produce daily 300 million cubic feet of methane gas for consumption Internal, annual production of 72,000 barrels of C2 + for the consumption of petrochemical units and daily production of 50 tons of sulfur

DMC implementation of phases 2, 3, 4, 5, 9 and 10 of South Pars
Implementation of DMC Unit Phases 2, 3, 4, 5, 9, and 10 South Pars

Ohm Completed Projects:

Assaluyeh Refinery Development Plan Phases 15 and 16 of South Pars
Construction of a gas refinery with a capacity of 50 million cubic meters per day to produce 1,700 million cubic feet of methane gas, 70 million cubic feet of ethane, 76.357 barrels of gas condensate, 1800 tons of propane and 1100 tons of butane and 400 tons of sulfur per day

Shahid Chamran Ahwaz Pump
Receipt of crude oil from Ahwaz 3 and Chamhcheh Khvshh utilizing 455,600 barrels per day and sending it to the greenhouse of the water pumped by turbine pumps and the implementation of the facility as a passive defense

Pyro New Crude Oil Ray – Tabriz

Construction and installation of the 5th Alefin complex of Assaluyeh
Tube welding of 400 thousand inches diameter – installation of 3300 tons of furnace and installation of fixed and rotating equipment with a weight of 1600 tons and installation of 5500 tons of steel structures – along with commissioning, cabling, insulations and other related measures to produce 500 thousand tons Ethylene product will be built annually

Development of fields

Capabilities:

Geotechnical and geological studies
Two-dimensional and three-dimensional exploration and seismic operations
Reservoir engineering, drilling and well evaluation
Perform drilling operations in the sea and inland
Water and gas injection stations in oil wells

The most important projects are:

Construction of Gachsaran Gas Injection Station
Construction of Gas Strengthening Station to increase the pressure of the South Pars gas and acid gases of the Gas and Liquid Gas Plant 1200 to 3,162 psi for the injection of 880 million cubic feet per day to the Gachsaran Oil Field to increase the field capacity

The most important projects are finished

The final design of 3D seismic data harvesting operation in Karkheh Bagh oilfield
Surveying Operations – Mining – Vibrating – Road Construction and Border Fault Testing on a Ground of 683 Kilometers in Northwest of Ahwaz

Seismic Operations in North Azadegan Oilfield Area
Data extraction from North Azadegan oilfield in Khuzestan province

Three-dimensional seismic operation of Tibo-Changwe
Surveying – Mining – Vibrating – Road and networking – Drilling – Data mining on a land area of 650 square kilometers in the Dehloran area of ​​Ilam province

Source » http://khatam.com/?part=menu&inc=&id=608